Editing
 |
| Dan and Cristi recording sound |
 |
| Mollie (Me) and Beth Editing the clips |
 |
| Dan editing the sound |
Here are some photograph's of our group doing some work on our sequence. The first shot is of myself and Beth editing our clips. Beth and i were cutting the clips we had and making sure they flowed continuously so that there were no jump cuts in our sequence. This took me and Beth nearly two hours as we wanted it to be to a good standard. We left out shots we didn't really like and put in the ones that worked well. At first we had a beginning shot of Beth running of the bridge and then we continued into another shot that was a point of view shot, however, the shots were to similar so we decided to change the beginning and use a different shot that was a lot different so it flowed better. While we were doing the editing however, Dan and Cristi were filming sound effects we could add into our sequence for example: Footsteps, breathing ect. After we had done the editing of that part of our sequence, Dan worked on the sound. He added quite scary music to our sequence which worked well with the shot.